: Standard operation requires water pressure between 0.2 and 0.4 MPa (approx. 2–4 atmospheres). If pressure is too high, a pressure reducer is necessary; if too low, a pump must be installed.

: The floor must be perfectly level and strong enough to support the weight of the cabin, the water, and the user. A clearance of at least 50 cm should be maintained on two sides for maintenance access, and 10–15 cm should remain between the cabin roof and the ceiling. instruktsii dushevaia kabina

Following a logical sequence prevents costly errors like leaks or structural instability. : Standard operation requires water pressure between 0

: Water supply and sewage pipes should be finalized before finishing the walls, as this often involves chasing. Use a mechanical filter (at least 100 microns ) to protect the fixtures from sediment. 2. Step-by-Step Installation Process : The floor must be perfectly level and

Proper preparation is the foundation of a durable installation.